WASTE

We promote a sustainable resource cycle based on an integrated waste value chain, from waste collection and transportation to recycling and final disposal & landfill.

Waste Recycling Full Value Chain

We are a 'cleantech platform' that provides comprehensive services across the entire waste management and resource circulation value chain including incineration and landfill of waste.

01

Collection & Transport

Collection and transport of industrial and municipal waste

02

Intermediate Processing

Shredding and sorting
Incineration & heat energy recovery

03

Recycling

Aggregate technology
Incineration & WtE recovery

04

Final Disposal

Landfill processing
Engineered Liner system protection

Waste Recycling

We focus on processing waste generated at industrial sites in a safe and efficient manner, minimizing environmental impact and promoting resource recycling.

Construction Waste

Recycled as recycled aggregate, recycled ascon, and scrap metal through sorting and crushing

Waste Synthetic Resin

Utilized as fuel through sorting, shredding, and grinding

Waste Soil

Production and sale of recycled soil using waste soil

Operation Sites

YIDO Eco Incheon

  • 174 Dream-ro, Seo-gu, Incheon
  • Construction waste approx. 7,200 ton/day
    Recycling approx. 1,560 ton/day

YIDO Eco Jeju

  • Jeju, Jeju Island
  • Construction waste 1,600 ton/day
    Ascon 720 ton/day

YIDO Eco Pyoseon

  • Pyoseon, Jeju Island
  • Construction waste 1,200 ton/day

YIDO Eco Hallim

  • Hallim, Jeju Island
  • Ready-mixed concrete 2,520 ton/day
    Ascon 640 ton/day

YIDO Eco Cheongju

  • Cheongju-si, Chungcheongbuk-do
  • Construction waste 1,200 ton/day

YIDO Eco Gokseong

  • Gokseong-gun, Jeollanam-do
  • Recycling 300 ton/day

Landfill

We ensure the safe and sanitary disposal of industrial general and hazardous waste while prioritizing environmentally responsible operations through air dome systems, odor trteatment facilities, and dust suppression measures.

Application of liner layer
and leachate blocking structure
Continuous monitoring
of surrounding environmental impact
Prevention of hazardous gas leakage through enclosed (air dome) landfill method

Operation Sites

YIDO Eco Jincheon

  • Jincheon-gun, Chungcheongbuk-do
  • Landfill 1.6 million ton
    Height approx. 50m (underground 35m, above ground 15m)